Class A — friable / notifiable

Friable removal — pipe lagging, textured ceilings, contaminated soil, contaminated dust.

The regulation in plain English

Class A work covers any friable asbestos removal — pipe lagging, sprayed coatings, vermiculite ceiling insulation, asbestos-contaminated soil, and any work the LAA classifies as friable. The 2016 Regulations require a Class A licensee, five working days' notice to WorkSafe before site start, full negative-pressure containment, independent licensed asbestos assessor (LAA) air monitoring, and a written clearance certificate before re-occupancy.

What's included

  • WorkSafe notification (5 working days before start)
  • Negative-pressure enclosure with decontamination unit
  • Independent LAA air monitoring throughout the job
  • Specialist class A removal techniques (wet methods, glove-bag, etc.)
  • Manifest-tracked disposal at licensed transfer station
  • Independent clearance air monitoring & written clearance certificate
  • Property-file documentation pack returned to owner

What's not included

  • Cannot be done by Class B operator — entire job must be Class A
  • Cannot proceed without LAA air-monitoring contract in place
  • Cannot proceed before WorkSafe notification confirmed
  • Property cannot be re-occupied until clearance certificate issued